|
|
Mark and his brother Phil cement the floor stones into position
|
|
|
The stone floor is laid out dry; the joints between the floor stones are filled with small river pebbles
|
|
|
The stone floor after everything has been leveled and cemented into place; several of the pebble fillers are done as well
|
|
|
The completed stone floor before the sealer is applied
|
|
|
The stone floor after sealing: one of the pebble sections
|
|
|
The stone floor as seen from the bathroom door
|
|
|
Another pebble section in the floor; the pebbles were collected by hand from the Boquet River
|
|
|
Several more pebble sections in the stone floor
|
|
|
Pebble sections in the stone floor
|
|
|
The finished (and sealed) stone floor
|
|
|
The finished (and sealed) stone floor as seen from the bathroom door
|
|
|
The stone flooring, still in its palletes
|